Sunday, October 30, 2011
Sunday, October 9, 2011
a new project
This one is going to be a tedious, meticulous, teeth-grinding project. Picking the colors was a project in itself. This is what I selected in the beginning.
The 10 light. From left to right, number 3 was replaced.
The 10 dark. From right to left, number 5 was replaced. (I know it's backwards.)
Now I have this, left to right, number 1 to 10, with new number 3.
And now this, left to right, number 11 to 20. (I found a new number 11, took out old number 15.)
Then came this, cutting two inch strips.
Then three strips of assembled color (not sewn).
I worked on assembling the next rows, sewing the three above, now my teeth hurt. I am off to bed. Tomorrow is a holiday, I will try more then.
The 10 light. From left to right, number 3 was replaced.
The 10 dark. From right to left, number 5 was replaced. (I know it's backwards.)
Now I have this, left to right, number 1 to 10, with new number 3.
And now this, left to right, number 11 to 20. (I found a new number 11, took out old number 15.)
Then came this, cutting two inch strips.
Then this, sub-cuts, 1-5, 6-10, 11-15, 16-20.
Then three strips of assembled color (not sewn).
I worked on assembling the next rows, sewing the three above, now my teeth hurt. I am off to bed. Tomorrow is a holiday, I will try more then.
Subscribe to:
Comments (Atom)